TalkBinder
Topic libraryContactSign inStart free trial
All toolbox talk topics

Hot Work and Welding Safety

US & Canada Welding Steel Mechanical

Why it matters

Sparks travel 35 ft (10 m) and smolder for hours - many building fires start with hot work.

Key points

  • Hot work permit before any welding, cutting, or grinding outside designated areas.
  • Clear or cover combustibles within 35 ft (10 m); wet down where needed.
  • Fire watch during work and for 30-60 minutes after it stops.
  • Welding screens protect others from arc flash.
  • Check both sides of walls and floors before cutting or welding on them.

Discussion

What hot work is scheduled and who is the fire watch for each task?

Need signatures and an audit binder? Run this talk in TalkBinder — 30 days free.

Related toolbox talks

  • Lockout / Tagout (Hazardous Energy)
  • Crane and Rigging Basics
  • Caught-In and Caught-Between Hazards
  • Fire Prevention and Extinguishers
  • Compressed Gas Cylinders
  • Powder-Actuated Tools

TalkBinder — toolbox talks with audit-ready binders for small contractors.

Toolbox talk libraryOSHA requirements guideCOR audit binder guideToolbox talk template
Contact usStart free trial